Due to seasonal weather conditions, please take additional care when travelling on campus. Be cautious of current roadway and walkway (sidewalks and pathways) conditions and adapt travel plans accordingly. Operations and Maintenance workers are actively removing snow, shovelling building entrances and sanding travel routes. Please take notice of your surroundings during snow removal.
Service disruptions
The Service Disruptions webpage shares information about disruptions on our campuses that could affect users of all abilities to access services. Building, construction, roadway, inclement weather and transit notifications are listed. This information is provided as a service to the community.
Please note that full details are not always available at the outset of a situation. Information and updates are posted as received. All general disruption posts are sorted by timeframe. Urgent notices, such as power outages or snowfall information, are posted at the top.
If your building is currently not accessible, please refer to the Service disruptions and emergencies information on UM Intranet to learn more about what to do during disruptions to the workplace.
On this page:
Roads, sidewalks and pathways
Urgent impact notice
Fort Garry- EITC E2 stairway to tunnels out of service Tuesday April 14 to Friday April 17 UPDATED
The stair in the engineering atrium connecting the first floor to the tunnels will be out of service for the erection and dismantling of scaffolding.
- Tuesday April 14 from 7 a.m. to 3p.m. to
- Friday April 17 from 7 a.m. to 3p.m. Updated
EITC E2 Floor plan
Road closures
Parking Lot A at Sifton Rd. - Prairie Biologics Building Site
- Posted: Jan 21, 2026
- Location(s): Parking Lot A at Sifton Rd.
- Timeframe (Est): Until further notice
- Category: Road/Parking Lot Closure
- Overview: Construction of the Prairie Biologics Accelerator Building has started in Parking Lot A. To facilitate construction, remaining sections of Parking Lot A and a portion of Sifton Rd. will be closed starting on or after Monday, January 26 (see map) and continuing for the duration of the project (approx. 2+ years). Building access and access to loading docks will be maintained to all surrounding buildings. Emergency vehicle access will be maintained throughout construction. Accessible parking will be available within the surrounding area. Pedestrian access will be maintained with some detours in place.
- Please plan accordingly. Barricades and safety signage will be clearly posted to safely direct vehicles, cyclists and pedestrians as required. Caution should be taken at all times during construction. Flag people will be on site to help direct traffic as needed. Your patience and cooperation to ensure everyone’s safety is appreciated.
- Questions or concerns: regarding this disruption can be directed to Kim Dandewich or (431) 323-5171.
Dysart Road Lane Closure - EXTENSION
- Location: Dysart Road between Wallace and A Lot (view image)
- Timeframe: March 30 – April 1, 9am – 3pm daily
- Category: Lane Closure
- Overview: Please be advised that there will be a lane closure on Dysart, March 30 – April 1, from 9-3 daily. The Eastbound lane near Wallace/A Lot will be closed to allow for construction. Signage will be in place, and flaggers will be on site to assist traffic and pedestrians. Please allow additional time for travel. The lane will reopen for regular use outside of these times.
- Questions/concerns: contact Kim Dandewich or 431-323-5171.
Service Road 1S - road closure
Location: Service Road 1S – alongside the Central Energy Plant (see image)
Timeframe: Thursday, April 9, 7 a.m. – 4 p.m.
Category: Road Closure
Overview: Please be advised that Service Road 1S will be closed beside the Central Energy Plant to allow for the presence of a crane on Thursday, April 9 (please see image). No through traffic is allowed on Service Rd 1S, but access to Parking Lot D/S will be maintained. Selected stalls in D Lot will be barricaded to allow for access. Flaggers will be on site to assist, signage and barricades will be in place.
Questions/concerns: please contact Alex Sopilnyak, alex.sopilnyak@umanitoba.ca, 204-797-5644
Service Road 1S affected area map
Construction notices
Fort Garry Campus
Fort Garry-Architecture 2 washrooms closure: summer/fall 2026
- Posted: Feb 22, 2024
- Updated: April 6, 2026
- Location(s): Washrooms 113 and 114
- Timeframe (Est): Feb 15th, 2024, until further notice
- Category: Washroom closure
- Overview: The washrooms in rooms 113 and 114 of the Architecture 2 building are temporarily closed due to a breach in the crawl space drain line.
- The piping in the crawl space is being replaced by the contractor.
- We apologize for any inconvenience this may cause and assure you that we are working diligently to resolve the situation as quickly as possible.
- We anticipate that substantial completion for this project will be achieved by the end of Summer 2026. Level 100 washrooms should be operational by early Fall 2026.
- In the meantime, we will post signs to direct you to the nearest available bathrooms in the building. Your understanding and cooperation during this time are greatly appreciated.
- Questions or concerns: regarding this shutdown can be directed to Bert Requeima or (204) 789-3822.
Fort Garry-Architecture 2 North side of building: ongoing
- Posted: July 8, 2025
- Location(s): North side of building
- Timeframe (Est): Starting July 14, 2025, for the duration of the project
- Category: Access Shutdown
- Overview: Mechanical Contractor will proceed with the replacement of sanitary and storm sewer piping in the crawlspace of the Architecture II building, starting Monday, July 14, 2025. Access to the work area will be provided by exposing a portion of the existing foundation along the recessed courtyard at the north side of the building (Excavation Area 1). The adjacent area on the east side will also be excavated as required to connect the new lines to existing concrete pipes outside the building.
- Questions/ concerns: regarding this shutdown can be directed to Alex Sopilnyak at (204) 797-5644.
Fort Garry-Investors Group Athletic Centre (IGAC) – Facility disruption: Summer 2026
Please be advised that the Investors Group Athletic Centre (IGAC) will undergo a planned, extensive closure this summer to complete facility upgrades.
- Closure period: June to September 2026
- Work includes: Complete court flooring replacement.
This timeline has been planned to balance impacts on facility users.
All spring programs and activities currently scheduled to take place within the Investors Group Athletic Centre, including the Fort Garry campus Spring Convocation ceremonies, are uninterrupted and will proceed as planned. Junior Bisons spring tournaments will also run as planned.
This closure window will regrettably primarily affect summer camp programming operated in the space. The Mini U team is developing alternative strategies to ensure our most popular program will run in alternative spaces. Staff and affected participants will be directly communicated with regarding specific impacts and plans.
This broader alert serves to notify the community of the facility timeline.
Units such as Bison Sports, Mini U and Junior Bisons will communicate specific operational updates, alternative locations and program plans directly to their respective participants, coaches and staff.
Fort Garry-Joyce Fromson Pool, Frank Kennedy Centre - Closed
The Joyce Fromson Pool is currently closed and will remain closed until further notice.
UM remains committed to offering high-quality swim programming and will continue to update the community as more information becomes available about reopening the Joyce Fromson Pool.
Fort Garry-Machray Hall: end date unknown
- Posted: September 16, 2024
- Location(s): Elevator – Main Elevator #1
- Timeframe (Est): Sept 20th, 2024 – Until building construction is done
- Category: Elevator Shutdown
Overview: Starting September 20th, 2024, the main elevator at Machray Hall will be out of service during building construction. Elevators at Parker and Armes will still be available at the tunnel level as usual.
- Question or concerns: regarding this disruption can be directed to Anne Cholakis at 431-278-8574.
Fort Garry-Parking Lots ACE and Contractor Parking: ongoing until Sept 2027
- Timeframe (Est): Tuesday, September 2, 2025 – September 2027
- Category: Parking Lot Closure
- Overview: Please be advised that Parking Lot ACE will be fully closed from September 2, 2025, to September 2027. The Contractor Parking lot will be partially closed for the same period.
- Questions/concerns: please contact Donna Sharpe at (204) 914-2872.
Fort Garry-Human Ecology-Ongoing- Until Further Notice
- Posted: January 30, 2026
- updated:February 20, 2026
- Location(s): Rooms 206 and 209
- Timeframe (Est): Ongoing- Until Further Notice
- Category: Access closure
- Overview: Rooms 209 (Office) and 206 (Classroom) are closed until further notice. Room 207 (Classroom) remains open.
- Questions/ concerns: regarding this shutdown can be directed to Andrew Lovatt or 204 298 2639
Fort Garry-Sidewalk along east side of St. John’s College Residence: March 2026
- Posted: March 19, 2026
- Location: Sidewalk along the east side of St. John’s College Residence
- Timeframe: Monday, March 23 – ongoing to project completion
- Category: Sidewalk Closure
- Overview: Please be advised that the sidewalk on the east side of St John’s College Residence will remain closed for the duration of the project to allow for construction activity (see map). Access to the Wallace Building and Parking Lots Q/K is available through the greenspace between St. John’s College and St. Paul’s College or via the Wallace tunnel, which can be accessed indoors through the Allen Building and Parker Building. Access to St John’s College and St. John’s College Residence will not be affected.
Please plan accordingly and allow additional time for the detour. Barricades and safety signage will be clearly posted to safely direct cyclists and pedestrians as required. Caution should be taken at all times during construction. Your patience and cooperation to ensure everyone’s safety is appreciated.
Fort Garry-Prairie Biologics Building Site - Pile Driving: Ongoing to May 29
Location: Prairie Biologics Building Site – A Lot
Timeframe: Ongoing to May 29, 2026, 8 a.m. to 4 p.m. daily
Category: Noisy Work
Overview: Please be advised that piling will continue on the new Prairie Accelerator Biologics Building in A Lot. During piling, noise will be audible in surrounding areas and buildings, and vibrations may be felt. Air quality in nearby buildings will be monitored throughout. Pile driving will occur only when exams are not in session.
We appreciate your patience during this necessary part of construction.
Questions/concerns, please contact Kim Dandewich, kim.dandewich@umanitoba.ca, 431-323-5171
Bannatyne Campus
Bannatyne-805 McDermot Avenue (former T-Block Building): Until Dec 2026
- Posted: September 11, 2024
- Location(s): Greenspace (Former T-Block Bldg) between Med Rehab, Medical Services & Chown
- Timeframe: Thursday, September 19, 2024 to December 2026
- Category: Construction Laydown in Greenspace
- Overview: Please be advised of the greenspace (former T-Block Building) will be turned over to the General Contractor as a construction laydown space starting Thursday, September 19, 2024 to December 2026. There will be four accessible parking spaces maintained on the east side of Med Rehab, see attached plan highlighted in teal.
- Question or concerns: regarding this disruption can be directed to Mark Ager at 204-228-4664.
Weather and environmental notices
This section provides updates on weather-related and environmental conditions that may impact campus operations, health, or safety. Notices may include air quality warnings, extreme temperatures, inclement weather and other events affecting building access or university services.
There are no notices at this time.
Contact Us
Contact us
Physical Plant – Service Disruptions
89 Freedman Crescent
University of Manitoba (Fort Garry campus)
Winnipeg, MB R3T 2N2